Author: admin

  • uPVC French Door — Double Leaf

    uPVC French Door — Double Leaf. A paired, full-height glazed door that opens a room to the terrace at uPVC system cost.

    uPVC French Door — Double Leaf — GLOBHAUS
    Double leaf · Inward or outward · Full-height glazing

    uPVC French Door — Double Leaf

    A paired, full-height glazed door that opens a room to the terrace at uPVC system cost.

    Overview

    The GH-UP220 is a double-leaf glazed door with a floating meeting stile: one leaf is the active door, the second is normally held by flush bolts and can be opened when the full width is needed. It gives the classic French-door appearance and a clear, level-ish walk-through without the machinery and cost of a lift-and-slide system.

    It is the missing uPVC door entry in the GLOBHAUS catalogue — until now the uPVC programme had windows but no dedicated door page. Both inward and outward opening variants are produced to match local convention, with a reinforced active leaf, multi-point locking and a low-threshold option where exposure allows.

    Typical specifications include garden and terrace access, balcony doors in apartment programmes, and internal dividers between a sunroom and the main living space.

    Technical specification

    Profile system70 / 80 mm steel-reinforced lead-free PVC-U door profile and sash
    ConfigurationTwo leaves, active + inactive, inward or outward, optional side lights / transom
    HardwareMulti-point lock on active leaf, flush bolts on inactive leaf, adjustable hinges, handle set
    GlazingFull-height double Low-E, laminated safety or tempered IGU; obscure / decorative options
    ThresholdStandard drained sill or low threshold subject to exposure and local code
    SealingCompression gaskets on both leaves plus a sealed floating meeting stile
    FinishWhite, black, grey, bronze, wood-grain film, custom laminate
    CertificationCE / NFRC / AS2047 documentation can be prepared for the destination market; confirm the exact standard and test report required at RFQ stage.
    Warranty / MOQ / Lead time10 years on profile · 1 × 20 ft container · 30–40 days
    ServiceOEM / ODM, project schedules, mixed-container loading

    Why specify this unit

    ✓
    Full-width opening: Release the flush bolts and both leaves swing, giving a wider clear aperture than a single door.
    ✓
    Simple, serviceable hardware: Multi-point lock, hinges and flush bolts are standard parts a local distributor can stock.
    ✓
    Two opening directions: Inward or outward to match market convention and interior furniture layout.
    ✓
    Side lights and transoms: Add fixed glazing around the door pair without changing the system platform.
    ✓
    uPVC cost base: French-door appearance without aluminium or timber pricing.
    ✓
    Low-threshold option: Level-ish access to terraces where drainage and exposure allow.

    Installation notes

    These are the points that decide whether the unit performs as specified after handover. They are issued as a drawing package with the order and should be read alongside the project’s own structural and waterproofing details.

    1. Confirm traffic and swing

    Check the swing direction against furniture, balustrades and escape routes before releasing drawings.

    2. Prepare the threshold

    Confirm the drainage strategy for the chosen sill height and verify the substrate is level and load-bearing.

    3. Square the outer frame

    Set packers at hinge and lock points, check diagonals and fix progressively to avoid twisting the door frame.

    4. Seal and test the sill

    Apply exterior weather and interior air seals and water-test the drained threshold before floor finishes.

    5. Hang both leaves

    Fit the inactive leaf first, set flush bolts, then hang and align the active leaf so the meeting stile compresses evenly.

    6. Commission the locks

    Adjust keeps and striker plates through the full multi-point cycle and confirm both leaves seal before handover.

    Where it is specified

    Garden and terrace access

    Full-height glazing and a wide opening for indoor-outdoor living.

    Apartment balconies

    A glazed door pair where a sliding unit is not wanted.

    Sunroom / living-room dividers

    Internal paired doors with matched glazing build-up to the surrounding system.

    Renovation and replacement

    Made-to-measure frames that fit existing openings without rebuilding the reveal.

    Maintenance and service life

    Hinge adjustment is the main service task on a double-leaf door: check leaf alignment annually and correct any drop at the hinge adjuster before it affects the flush bolts. Keep the sill drainage clear, lubricate the multi-point gearbox yearly, and inspect the meeting-stile gasket. Flush bolts and handles are replaceable standard parts.

    How it compares

    CriterionThis configurationAlternative
    Clear openingFull width when both leaves are releasedLift-and-slide: about half to two thirds
    Swing spaceRequires clear floor area in the swing directionNone — panels stay in the frame plane
    Hardware costLower — hinges, lock and flush boltsHigher — lift gearbox and bogies
    Best fitTerraces, balconies, classic façades, modest openingsVery wide openings, level access, heavy panels

    Frequently asked questions

    Do you supply uPVC doors as well as windows?

    Yes. The GH-UP220 double-leaf French door is the dedicated uPVC door in the GLOBHAUS range, alongside the GH-UP210 lift-and-slide patio door.

    Can both leaves open?

    Yes. The active leaf carries the handle and multi-point lock; the inactive leaf is held by flush bolts and can be released for a full-width opening.

    Inward or outward opening?

    Both are available. The direction is fixed at drawing approval because hinge, threshold and screen details differ.

    Can side lights or a transom be added?

    Yes. Fixed side lights and transom units are built on the same profile system with a matched glazing build-up.

    What are MOQ and lead time?

    One 20 ft container with 30–40 days production after drawing approval; doors and windows can be combined in one container.

    Gallery

    uPVC French Door — Double Leaf — GLOBHAUS uPVC French Door — Double Leaf — GLOBHAUS uPVC French Door — Double Leaf — GLOBHAUS

    Talk to the factory

    Send the opening schedule, glazing build-up and target market. Quotations within 24 hours.

    Request a Quote
  • uPVC Bay & Bow Window — Projected Glazing

    uPVC Bay & Bow Window — Projected Glazing. A projected glazing composition that adds floor area, daylight and a façade feature from standard uPVC parts.

    uPVC Bay & Bow Window — Projected Glazing — GLOBHAUS
    Projected façade · Angled or curved build · Seat board / head detail

    uPVC Bay & Bow Window — Projected Glazing

    A projected glazing composition that adds floor area, daylight and a façade feature from standard uPVC parts.

    Overview

    Bay and bow windows project beyond the wall line, turning a flat opening into a three-dimensional glazed composition. A bay normally uses three panels with two angled side lights; a bow uses four or more shallow-angle panels for a curved appearance. Both are assembled from standard GLOBHAUS uPVC sashes joined with purpose-made angle or radius mullions.

    The GH-UP150 package covers the glazed units plus the junction details: corner posts, head and sill boards, reinforcement where the projection is cantilevered, and the flashing interface to the wall. Because the projection changes how water and load are handled, the structural and waterproofing details are reviewed at drawing approval rather than left to the installer.

    Typical use is living-room feature glazing in residential projects, hotel lounges and street-facing retail façades where daylight and a wider view are part of the design intent.

    Technical specification

    Profile system70 / 80 mm lead-free PVC-U sashes with reinforced corner / angle mullions
    Configurations3-panel bay (30° / 45° side lights) or 4–5 panel bow (shallow angles)
    OperationFixed centre light with operable side casements or tilt-turn units, per project
    GlazingDouble or triple Low-E, laminated or tempered safety IGU; matching build-up across all panels
    StructureProjection support, head and sill boards, cantilever reinforcement checked per opening
    WaterproofingHead flashing, sill drainage and corner-post seals detailed at drawing approval
    FinishWhite, black, grey, bronze, wood-grain film, custom laminate
    CertificationCE / NFRC / AS2047 documentation can be prepared for the destination market; confirm the exact standard and test report required at RFQ stage.
    Warranty / MOQ / Lead time10 years on profile · 1 × 20 ft container · 35–45 days
    ServiceOEM / ODM, project engineering, panel-by-panel packing schedule

    Why specify this unit

    ✓
    More daylight, wider view: Angled side lights pull light in from two directions that a flat window cannot reach.
    ✓
    Usable interior depth: The projection creates a window seat or display shelf without structural alterations.
    ✓
    Built from standard sashes: Cost stays close to a standard uPVC window; only the junction posts are project-specific.
    ✓
    Engineered junctions: Head, sill and corner details are issued as drawings so waterproofing is not improvised on site.
    ✓
    Operable side panels: Ventilation is retained by making side lights casement or tilt-turn while the centre stays fixed.
    ✓
    Documented packing: Each panel is numbered against the elevation to avoid on-site mix-ups.

    Installation notes

    These are the points that decide whether the unit performs as specified after handover. They are issued as a drawing package with the order and should be read alongside the project’s own structural and waterproofing details.

    1. Verify the support

    Confirm the projection is carried by a bracket, corbel or structural sill before the frame is released.

    2. Dry-assemble the posts

    Set out the angle mullions on a level base and check all panel angles against the approved elevation.

    3. Anchor progressively

    Fix the base and head boards at specified centres, tightening in sequence to keep the projection square.

    4. Flash the head

    Install head flashing that drains to the outside and ties into the wall’s weather line; this is the critical water detail.

    5. Seal every corner post

    Apply compatible sealant at post joints and water-test the full composition before interior finishes.

    6. Fit and commission sashes

    Glaze panels in elevation order, then adjust operable side lights and record the panel numbering at handover.

    Where it is specified

    Residential living rooms

    Feature glazing with a window seat and wider outlook.

    Hotel lounges and restaurants

    Daylight from three directions and a distinctive street-facing elevation.

    Retail frontages

    Display depth behind the glass without extending the building footprint.

    Renovation of period façades

    Made-to-measure projections that match existing bay geometry.

    Maintenance and service life

    The head flashing and corner-post seals are the service-critical items: inspect them annually and after severe storms. Clear the sill drainage path twice a year, check that the projection brackets remain sound, and re-adjust operable side sashes as for a standard casement. Keep the panel numbering drawing for future glass replacement.

    How it compares

    CriterionThis configurationAlternative
    Façade effectProjects beyond the wall, three-direction daylightFlat window: single-plane elevation
    Waterproofing complexityHigher — head flashing and post jointsStandard perimeter seal
    CostHigher due to junction posts and supportBaseline
    Best fitFeature glazing, living rooms, hospitality frontagesRepeated standard openings

    Frequently asked questions

    What is the difference between a bay and a bow window?

    A bay usually has three panels with two angled side lights; a bow uses four or more shallow-angle panels for a curved appearance. Both are built from standard GLOBHAUS uPVC sashes with project-specific angle posts.

    Does a bay window need structural support?

    Yes. The projection must be carried by brackets, corbels or a structural sill. GLOBHAUS reviews the support and issues head/sill/corner details at drawing approval.

    Can the side panels open?

    Yes. The centre light is normally fixed and the side lights can be casement or tilt-turn units; the mix is set on the approved elevation.

    How is the head made watertight?

    With a head flashing that ties into the wall weather line and drains outward, plus sealed corner posts and a drained sill. These details are supplied as drawings rather than left to site practice.

    What are MOQ and lead time?

    One 20 ft container with 35–45 days production after drawing approval, reflecting the project-specific junction parts.

    Gallery

    uPVC Bay & Bow Window — Projected Glazing — GLOBHAUS uPVC Bay & Bow Window — Projected Glazing — GLOBHAUS uPVC Bay & Bow Window — Projected Glazing — GLOBHAUS

    Talk to the factory

    Send the opening schedule, glazing build-up and target market. Quotations within 24 hours.

    Request a Quote
  • uPVC Awning & Hopper Window — Ventilation First

    uPVC Awning & Hopper Window — Ventilation First. Ventilate during light rain and keep the opening restricted — the specification for wet climates and secure rooms.

    uPVC Awning & Hopper Window — Ventilation First — GLOBHAUS
    Top or bottom hinge · Rain-safe ventilation · Restricted opening

    uPVC Awning & Hopper Window — Ventilation First

    Ventilate during light rain and keep the opening restricted — the specification for wet climates and secure rooms.

    Overview

    Awning windows hinge at the top and project outward; hopper windows hinge at the bottom and open inward. Both are shallow-angle ventilation units: the open sash forms a small canopy (awning) or a controlled inward deflector (hopper), so air can move while rain is kept out and the opening remains too narrow to climb through.

    The GH-UP140 is used as a standalone ventilation window in wet coastal climates and, more often, as a complementary unit above or below a fixed picture window or beside a larger casement. It is also the standard choice for basements, bathrooms, utility rooms and ground-floor rooms where a restricted, lockable opening is required.

    Single-handle or roto-winder operation is available, with friction stays set to hold the sash at the selected angle under wind load.

    Technical specification

    Profile system60 / 65 / 70 / 80 mm lead-free PVC-U, steel reinforced as required
    OperationTop-hung outward (awning) or bottom-hung inward (hopper), restricted opening angle
    HardwareFriction stays, multi-point or two-point lock, optional roto-winder and opening limiter
    GlazingDouble Low-E, laminated acoustic or tempered safety IGU; obscured glass option
    SealingFull-perimeter compression gasket, drained rebate with welded corners
    Typical placementAbove / below fixed lights, transoms, basements, bathrooms, utility rooms
    FinishWhite, black, grey, bronze, wood-grain film, custom laminate
    CertificationCE / NFRC / AS2047 documentation can be prepared for the destination market; confirm the exact standard and test report required at RFQ stage.
    Warranty / MOQ / Lead time10 years on profile · 1 × 20 ft container · 30–40 days
    ServiceOEM / ODM, project schedules, mixed-container loading

    Why specify this unit

    ✓
    Ventilation in light rain: The open sash sheds water outward, so rooms stay aired during coastal showers.
    ✓
    Restricted secure opening: A fixed maximum angle keeps the aperture too small for access on ground-floor and basement units.
    ✓
    Fills awkward apertures: Designed to sit above or below a fixed light, using narrow structural openings efficiently.
    ✓
    Winder option: Roto-winder operation suits high transoms where a handle cannot be reached.
    ✓
    Privacy glazing: Obscured or laminated glass options for bathrooms and street-facing ground floors.
    ✓
    Simple hardware: Friction stays and a compact lock keep after-sales parts inexpensive.

    Installation notes

    These are the points that decide whether the unit performs as specified after handover. They are issued as a drawing package with the order and should be read alongside the project’s own structural and waterproofing details.

    1. Confirm the hinge direction

    Awning (top-hung outward) and hopper (bottom-hung inward) are not interchangeable; verify against the elevation before production.

    2. Check the reveal

    Outward awning sashes need projection clearance for blinds, shutters and walkways below.

    3. Level and square the frame

    Use packers at stay and lock points and check diagonals before anchoring.

    4. Seal and drain

    Fit exterior weather and interior air seals and confirm the rebate drainage path is clear.

    5. Set the stay friction

    Adjust the friction stays so the sash holds its angle under local wind load without slamming shut.

    6. Verify the limiter

    Cycle the unit and confirm the restricted opening and lock engagement before handover.

    Where it is specified

    Wet coastal and tropical climates

    Background ventilation continues through light rain.

    Basements and ground-floor rooms

    Restricted lockable opening where security is a concern.

    Bathrooms and utility spaces

    Ventilation with obscured glazing for privacy.

    Transoms above fixed glazing

    Adds operable ventilation to a large picture-window composition without breaking the sightline.

    Maintenance and service life

    Clear the rebate drainage and wipe the stay arms twice a year; coastal sites should rinse salt film from exposed hardware quarterly. Friction stay tension is adjustable — if the sash no longer holds its angle, tighten the stay adjuster rather than replacing the unit. Gaskets and winder mechanisms are standard replaceable parts.

    How it compares

    CriterionThis configurationAlternative
    Ventilation in rainYes — sash forms a canopy / inward deflectorCasement: rain enters a fully open sash
    Open areaSmall, restricted by designCasement: full aperture
    Security at ventilation positionRestricted opening with engaged lockCasement: fully open or closed
    Best fitWet climates, basements, bathrooms, transomsLiving rooms needing full opening

    Frequently asked questions

    What is the difference between awning and hopper windows?

    An awning hinges at the top and opens outward; a hopper hinges at the bottom and opens inward. Both provide restricted, rain-tolerant ventilation, and the direction is fixed on the approved drawing.

    Can these be left open when it rains?

    In light rain, yes — the outward awning sash sheds water and the inward hopper deflects it. Driving wind and extreme exposure still require the unit to be closed.

    Are opening limiters and winders available?

    Yes. Restricted-angle limiters are standard options and roto-winders are used for high transoms where the handle is out of reach.

    Can they be combined with a fixed picture window?

    That is the most common layout: an awning or hopper above/below a fixed light adds ventilation without interrupting the main sightline.

    What are MOQ and lead time?

    One 20 ft container with 30–40 days production after drawing approval; awning and hopper units can be mixed with other uPVC configurations.

    Gallery

    uPVC Awning & Hopper Window — Ventilation First — GLOBHAUS uPVC Awning & Hopper Window — Ventilation First — GLOBHAUS uPVC Awning & Hopper Window — Ventilation First — GLOBHAUS

    Talk to the factory

    Send the opening schedule, glazing build-up and target market. Quotations within 24 hours.

    Request a Quote
  • Passive-House Ready uPVC Window — Triple Glazed

    Passive-House Ready uPVC Window — Triple Glazed. A deep-profile, triple-glazed uPVC platform for projects with a declared Uw and air-tightness target.

    Passive-House Ready uPVC Window — Triple Glazed — GLOBHAUS
    Triple IGU · Warm-edge spacer · Deep multi-chamber profile

    Passive-House Ready uPVC Window — Triple Glazed

    A deep-profile, triple-glazed uPVC platform for projects with a declared Uw and air-tightness target.

    Overview

    The GH-UP300 is the thermal end of the GLOBHAUS uPVC range. It combines a deep multi-chamber profile, triple insulated glazing with warm-edge spacers and a triple compression gasket system, and is intended for projects that state a whole-window U-value, air-tightness class or condensation-risk requirement in the tender documents.

    Rather than quoting a single catalogue Uw, the build is engineered against the project’s design target: profile series, glass build-up, spacer, gas fill and installation detail all change the declared number. GLOBHAUS issues the calculation sheet and the supporting test documentation with the quotation so the value can be checked by the project’s energy consultant.

    Typical applications are Passive House and low-energy housing, heating-dominated climates, and retrofit programmes where the existing façade is being upgraded to a higher thermal standard without switching to a more expensive aluminium system.

    Technical specification

    Profile system88 / 94 / 112 / 166 mm deep multi-chamber lead-free PVC-U, steel reinforced
    GlazingTriple IGU, Low-E coatings, argon or krypton fill, warm-edge spacer; laminated option
    Thermal targetWhole-window Uw calculated per build-up and issued as a project calculation sheet, not a fixed catalogue claim
    Spacer / edge sealWarm-edge spacer with dual barrier seal to limit linear thermal bridging at the glass edge
    SealingThree-level compression gasket system, welded corners, drained and pressure-equalised rebate
    Air tightnessClass and test report confirmed against project specification at RFQ stage
    HardwareHeavy-duty tilt-turn or fixed-light configuration with multi-point locking
    FinishWhite, black, grey, bronze, wood-grain film, custom laminate
    CertificationCE / NFRC / AS2047 documentation can be prepared for the destination market; confirm the exact standard and test report required at RFQ stage.
    Warranty / MOQ / Lead time10 years on profile · 1 × 20 ft container · 35–45 days

    Why specify this unit

    ✓
    Engineered to a declared Uw: The quotation is built around the project’s thermal target with a calculation sheet, not a marketing number.
    ✓
    Warm-edge spacer: Reduces the glass-edge thermal bridge that dominates frame performance in cold climates.
    ✓
    Triple gasket levels: Separate water, air and drainage planes reduce condensation risk at the rebate.
    ✓
    Deep-profile stiffness: 88–166 mm series handle heavy triple IGUs without additional structural reinforcement of the opening.
    ✓
    uPVC cost base: Delivers high thermal performance at a lower system cost than thermally broken aluminium.
    ✓
    Documentation for consultants: Glass build-up, spacer, gas fill and declared values are supplied for the energy model.

    Installation notes

    These are the points that decide whether the unit performs as specified after handover. They are issued as a drawing package with the order and should be read alongside the project’s own structural and waterproofing details.

    1. Agree the performance target

    Fix the required Uw, air-tightness class and installation detail with the energy consultant before drawings are released — the glass build-up depends on it.

    2. Specify the installation plane

    High-performance windows must be positioned in the insulation layer; a frame set back into the cold zone creates a thermal bridge the calculation will not cover.

    3. Use airtight tapes

    Apply vapour-open exterior and vapour-tight interior tapes with a continuous, compressed connection to the frame.

    4. Support the weight

    Triple IGUs are heavy: use load-bearing packers and confirm the fixing schedule with the structural designer.

    5. Protect the spacer seal

    Never drill or fix through the glazing rebate; keep the edge seal clear of sealants that are not chemically compatible.

    6. Verify on site

    Blower-door or per-window air-leakage checks after installation, plus a written record of the installed build-up for the energy certificate.

    Where it is specified

    Passive House / low-energy housing

    Where a declared whole-window Uw is a contractual requirement.

    Cold and heating-dominated climates

    Triple glazing and warm-edge spacers cut heat loss and interior condensation risk.

    Deep-energy retrofit

    Upgrading an existing façade without moving to a premium aluminium system.

    Projects with third-party energy modelling

    Calculation sheets and build-up documentation feed directly into the consultant’s model.

    Maintenance and service life

    Thermal performance depends on the seals remaining compressed and the rebate staying dry. Inspect gaskets annually, clear drainage slots twice a year and re-adjust multi-point cams if the handle becomes easier to turn. Avoid trimming or planing the frame on site, and keep the original glass build-up record: replacing an IGU with a different coating or gas fill changes the declared Uw.

    How it compares

    CriterionThis configurationAlternative
    Thermal targetEngineered to a project-declared Uw with a calculation sheetStandard 60–70 mm uPVC: no declared target
    GlazingTriple IGU with warm-edge spacer as baselineDouble Low-E as baseline
    Installation sensitivityHigh — insulation-plane positioning and airtight tapes are mandatoryModerate
    Best fitPassive House, cold climates, certified retrofitsStandard residential, mild climates

    Frequently asked questions

    Is this window certified by the Passive House Institute?

    No certification claim is made for a standard product. The GH-UP300 is engineered to a project-declared thermal target; the required test reports and calculation sheets are listed and supplied at RFQ stage for the destination market.

    What Uw value can be achieved?

    It depends on the profile series, triple glass build-up, coating, gas fill and spacer. We issue a project calculation sheet with the declared value rather than quoting a single fixed number.

    Does installation affect the declared performance?

    Yes. The frame must sit in the insulation plane with continuous airtight tapes; a frame installed back in the cold zone creates a thermal bridge that a product calculation cannot cover.

    Can triple glazing be combined with tilt-turn operation?

    Yes, using heavy-duty hardware. Sash weight is checked against the hinge and gearbox rating before the configuration is released.

    What are MOQ and lead time?

    One 20 ft container with 35–45 days production after drawing and glass build-up approval.

    Gallery

    Passive-House Ready uPVC Window — Triple Glazed — GLOBHAUS Passive-House Ready uPVC Window — Triple Glazed — GLOBHAUS Passive-House Ready uPVC Window — Triple Glazed — GLOBHAUS

    Talk to the factory

    Send the opening schedule, glazing build-up and target market. Quotations within 24 hours.

    Request a Quote
  • uPVC Lift & Slide Patio Door

    uPVC Lift & Slide Patio Door. Heavy glass panels that lift off their seals before they glide — large openings without stiff handles.

    uPVC Lift & Slide Patio Door — GLOBHAUS
    Lift-then-glide · Large panels · Flush threshold option

    uPVC Lift & Slide Patio Door

    Heavy glass panels that lift off their seals before they glide — large openings without stiff handles.

    Overview

    A lift-and-slide door solves a specific problem: a large glazed panel is too heavy to drag across a compression gasket. Turning the handle raises the panel a few millimetres onto its carriage, releasing the seal; the panel then glides on rollers with a light push and drops back onto the gasket when the handle returns to the closed position.

    The GH-UP210 brings that mechanism into a reinforced lead-free PVC-U platform. It suits patio, terrace and garden-room openings where a standard slider would need excessive force, and where a low or flush threshold is required for level access. Two-, three- and four-panel configurations are engineered with fixed and moving leaves to suit the opening width.

    Because the closed panel sits down onto its gasket rather than brushing past it, air and water tightness is closer to a compression-sealed window than to a conventional sliding door.

    Technical specification

    Profile system70 / 80 / 88 mm steel-reinforced lead-free PVC-U, reinforced meeting stile
    OperationHandle-driven lift (approx. 6–10 mm) onto tandem carriage, then horizontal glide
    Configurations2 / 3 / 4 panels, fixed + moving combinations, optional symmetrical centre opening
    HardwareLift-and-slide gearbox, tandem bogies, stainless running track, multi-point hook locking
    GlazingDouble or triple Low-E, laminated safety IGU; panel weight checked against carriage rating
    ThresholdStandard drained sill or low / flush threshold subject to exposure and local code
    FinishWhite, black, grey, bronze, wood-grain film, custom laminate
    CertificationCE / NFRC / AS2047 documentation can be prepared for the destination market; confirm the exact standard and test report required at RFQ stage.
    Warranty / MOQ / Lead time10 years on profile · 1 × 20 ft container · 35–45 days
    ServiceOEM / ODM, project engineering, panel-by-panel packing schedule

    Why specify this unit

    ✓
    Light operation at large sizes: Lifting off the gasket removes sliding friction, so 100 kg-plus panels still move with one hand.
    ✓
    Compression seal when closed: The panel drops back onto the gasket, giving better air and water tightness than a brush-sealed slider.
    ✓
    Low threshold options: Level access is possible where exposure, drainage and local building rules allow it.
    ✓
    Panel-by-panel logistics: Large leaves are individually foam-framed and corner-guarded with a numbered packing schedule.
    ✓
    Configurable opening: Fixed/moving panel layouts are engineered per opening, including centre-opening symmetrical builds.
    ✓
    Documented hardware: Gearbox, bogie and track part numbers are listed at handover for local spare-part stocking.

    Installation notes

    These are the points that decide whether the unit performs as specified after handover. They are issued as a drawing package with the order and should be read alongside the project’s own structural and waterproofing details.

    1. Engineer the threshold first

    Confirm the drainage strategy and exposure rating before choosing a low or flush sill; a flush threshold without adequate drainage is the most common failure on this product type.

    2. Prepare a level, load-bearing base

    The track carries the full panel weight; substrate flatness and load capacity are verified before the frame arrives.

    3. Set and anchor the outer frame

    Level the running track across the full span, fix at specified centres and keep the drainage channel clear.

    4. Water-test the sill

    Flood-test the drained sill and confirm outlets discharge outside before any internal floor finishes are laid.

    5. Install the carriage and panels

    Fit bogies, lift panels into the track with suction equipment, then set roller height so all meeting stiles are parallel.

    6. Commission the lift cycle

    Adjust the gearbox so every panel lifts evenly and drops fully onto its gasket; record the settings in the handover sheet.

    Where it is specified

    Terrace and patio openings

    Wide glazed openings that would be too heavy for a standard sliding door.

    Garden rooms and sunroom interfaces

    Large moving leaves with a closed-state compression seal for year-round use.

    Accessible ground-floor living

    Low-threshold configurations where level access is a design requirement.

    Hospitality and villas

    Quiet, one-hand operation with a premium feel at a lower cost than an aluminium lift-slide system.

    Maintenance and service life

    Keep the running track clean and free of grit, vacuum the sill drainage outlets quarterly, and never oil the running surface. The lift gearbox and bogies are the only mechanical wear items: check handle effort annually and re-adjust panel height if a leaf stops dropping evenly onto its gasket. Gaskets are replaceable without removing the frame.

    How it compares

    CriterionThis configurationAlternative
    Operating effort on large panelsLow — panel lifts off the seal before glidingStandard slider: rises sharply with panel weight
    Closed-state air tightnessCompression gasket, close to a windowBrush-sealed interlock, lower
    System cost / complexityHigher — lift gearbox and bogiesLower — simple rollers
    Best fitWide terraces, level access, year-round glazed roomsSmaller openings, budget-led programmes

    Frequently asked questions

    How does a lift-and-slide door differ from a normal sliding door?

    Turning the handle raises the panel a few millimetres onto a wheeled carriage so it no longer drags on the gasket. It then glides easily and drops back onto a compression seal when closed.

    Can the threshold be flush with the floor?

    Low and flush thresholds are available, but they depend on exposure, drainage design and local code. The drainage strategy is confirmed during drawing approval before a flush sill is released.

    How large can each panel be?

    Panels are made to the opening and limited by glazing weight and carriage rating. Provide the opening schedule and glass build-up and we confirm panel dimensions and weight before quotation.

    Is triple glazing possible?

    Yes, subject to panel weight and the selected carriage. Triple Low-E and laminated safety build-ups are available with the weight check performed at RFQ stage.

    What are MOQ and lead time?

    One 20 ft container with 35–45 days production after drawing approval, reflecting the extra hardware and panel-by-panel packing.

    Gallery

    uPVC Lift & Slide Patio Door — GLOBHAUS uPVC Lift & Slide Patio Door — GLOBHAUS uPVC Lift & Slide Patio Door — GLOBHAUS

    Talk to the factory

    Send the opening schedule, glazing build-up and target market. Quotations within 24 hours.

    Request a Quote
  • uPVC Sliding Window — Two & Three Track

    uPVC Sliding Window — Two & Three Track. Horizontal panels that free the space in front of the window — the practical choice for balconies and tight rooms.

    uPVC Sliding Window — Two & Three Track — GLOBHAUS
    Horizontal travel · No swing clearance · Two or three track

    uPVC Sliding Window — Two & Three Track

    Horizontal panels that free the space in front of the window — the practical choice for balconies and tight rooms.

    Overview

    The GH-UP130 uses horizontally travelling panels on two or three tracks, so no sash projects into the room or over the façade. That single geometric difference is why sliding units are specified for balconies, kitchens, narrow corridors and any room where furniture or a walkway sits directly in front of the glazing.

    Two-track configurations give one moving panel per fixed panel; three-track builds add a second moving leaf and allow insect or shade screens to run on their own track. Reinforced lead-free PVC-U profiles carry tandem rollers, and a brush-plus-gasket perimeter manages the air and water seal that a compression-sealed casement gets from its gasket alone.

    For North American programmes this platform is quoted as vinyl sliding windows; for Europe, the Middle East and Africa it is specified as uPVC sliding windows. Both wordings map to the same GLOBHAUS GH-UP130 production line.

    Technical specification

    Profile system62 / 70 / 80 / 88 mm lead-free PVC-U, steel-reinforced sash and frame
    TracksTwo-track (1 fixed + 1 moving) or three-track (2 moving / screen track)
    HardwareTandem adjustable rollers, stainless or coated track, two-point hook lock, optional anti-lift block
    GlazingDouble Low-E, laminated acoustic or tempered safety IGU; 20–32 mm typical
    Panel sizeMade to opening; maximum width/weight confirmed against roller rating at RFQ stage
    SealingInterlocking meeting stile with brush seals, drained sill track, sill weep outlets
    FinishWhite, black, grey, bronze, wood-grain film, custom laminate
    CertificationCE / NFRC / AS2047 documentation can be prepared for the destination market; confirm the exact standard and test report required at RFQ stage.
    Warranty / MOQ / Lead time10 years on profile · 1 × 20 ft container · 30–40 days
    ServiceOEM / ODM, project schedules, screen and track accessories

    Why specify this unit

    ✓
    Zero swing clearance: Panels stay inside the frame footprint, so furniture, blinds and balcony space are unaffected.
    ✓
    Up to two thirds clear opening: Three-track builds let two leaves stack for a wider unobstructed aperture than a single slider.
    ✓
    Adjustable rollers: Roller height can be corrected on site after the building settles, without replacing the sash.
    ✓
    Integrated screen track: Three-track variants accept insect or solar screens without surface-mounted add-ons.
    ✓
    Anti-lift security: Anti-lift blocks and hook locks address the usual specification objection to sliding units.
    ✓
    Regional vocabulary: Supplied and documented as vinyl sliding windows for North America and uPVC sliding windows elsewhere.

    Installation notes

    These are the points that decide whether the unit performs as specified after handover. They are issued as a drawing package with the order and should be read alongside the project’s own structural and waterproofing details.

    1. Protect and level the sill

    The sill track must be dead level across its full length; a 2–3 mm fall causes panels to self-drive and defeats the lock alignment.

    2. Dry-fit the outer frame

    Confirm the track is square and the drainage outlets point outward before fixing.

    3. Anchor through the track zone

    Fix at the specified centres without piercing the drainage channel or the roller running surface.

    4. Seal the perimeter

    Apply exterior weather and interior air seals, then water-test the sill and confirm weep outlets discharge freely.

    5. Lift in the panels

    Insert fixed panels first, then moving leaves; set roller height with the adjustment screw until the meeting stiles are parallel.

    6. Set locks and anti-lift

    Align hook keeps with the striker and fit anti-lift blocks, then cycle every panel under load before handover.

    Where it is specified

    Apartment balconies

    No inward or outward swing means balcony furniture and doors stay usable.

    Kitchens and utility rooms

    Ventilation above worktops without clashing with taps, blinds or cabinets.

    Narrow corridors and small rooms

    Panels travel within the wall thickness, preserving circulation space.

    North American vinyl replacement programmes

    Same platform documented as vinyl sliding windows with region-appropriate terminology and glazing.

    Maintenance and service life

    Keep the sill track free of grit — vacuum the channel quarterly and wash the roller path with a mild detergent. Brush seals at the meeting stile are replaceable wear items; check them annually and adjust roller height if a panel begins to drag. Lubricate the hook lock but avoid oil on the track itself, which attracts dust.

    How it compares

    CriterionThis configurationAlternative
    Swing clearanceNone — panels stay in the frame planeCasement / tilt-turn: needs clear space
    Maximum open areaRoughly 50–66% of the apertureCasement: close to 100%
    Air tightnessBrush-sealed interlock, good but below compression gasketsTilt-turn: compression seal on full perimeter
    Best fitBalconies, kitchens, tight rooms, vinyl replacementHigh-rise, cold climates, maximum insulation

    Frequently asked questions

    What is the difference between uPVC and vinyl sliding windows?

    The two terms describe the same material — unplasticised polyvinyl chloride. North American specifications normally say vinyl; European, Middle Eastern and African tenders say uPVC. GLOBHAUS supplies the GH-UP130 platform under either wording.

    How much of the window actually opens?

    A two-track unit opens about half the aperture; a three-track build with two moving leaves can approach two thirds, with an optional independent screen track.

    Are sliding windows secure enough for ground-floor use?

    Two-point hook locks, anti-lift blocks and a reinforced meeting stile are standard options; the project security class should be stated at RFQ stage so the correct hardware is quoted.

    What sizes are possible?

    Panels are made to the opening, but maximum width and weight are set by the roller rating and wind load. Send the opening schedule and we confirm the limits before quotation.

    What are MOQ and lead time?

    One 20 ft container with 30–40 days production after drawing approval; mixed uPVC configurations can be combined in one container.

    Gallery

    uPVC Sliding Window — Two & Three Track — GLOBHAUS uPVC Sliding Window — Two & Three Track — GLOBHAUS uPVC Sliding Window — Two & Three Track — GLOBHAUS

    Talk to the factory

    Send the opening schedule, glazing build-up and target market. Quotations within 24 hours.

    Request a Quote
  • uPVC Casement Window — Side-Hung

    uPVC Casement Window — Side-Hung. A simple, robust side-hung sash that delivers full opening area at the lowest unit cost in the uPVC range.

    uPVC Casement Window — Side-Hung — GLOBHAUS
    Side-hung · Outward or inward · Cost-efficient volume specification

    uPVC Casement Window — Side-Hung

    A simple, robust side-hung sash that delivers full opening area at the lowest unit cost in the uPVC range.

    Overview

    The GH-UP120 is a side-hung casement built for volume programmes where the specification calls for reliable operation, straightforward installation and a predictable landed price. One sash rotates on side-mounted hinges to open the full clear aperture, which makes it the natural choice for cross-ventilation in housing and light-commercial projects.

    Compared with a tilt-turn unit, the hardware set is simpler: a handle, a multi-point espagnolette, friction stays and a pair of hinges. Fewer moving parts means fewer adjustment callbacks and a spare-part list a local distributor can carry without specialist stock. Outward and inward opening variants are both available to match local façade rules.

    It is the default specification for low- and mid-rise residential developments, schools and renovation programmes in warm and temperate markets, where full-open ventilation matters more than secure night ventilation.

    Technical specification

    Profile system60 / 65 / 70 / 80 mm multi-chamber lead-free PVC-U, steel reinforced where required
    OperationSide-hung casement, inward or outward, single or double sash, optional top vent
    HardwareEspagnolette multi-point lock, friction stay, adjustable hinge, optional child limiter
    GlazingDouble Low-E, triple, laminated acoustic or tempered safety IGU; 24–40 mm build-ups
    SealingCompression gaskets with welded corners and drained glazing rebate
    FinishWhite, black, grey, bronze, wood-grain film, custom laminate
    CertificationCE / NFRC / AS2047 documentation can be prepared for the destination market; confirm the exact standard and test report required at RFQ stage.
    Screen optionsFixed, sliding or pleated insect screen supplied to suit inward/outward variant
    Warranty / MOQ / Lead time10 years on profile · 1 × 20 ft container · 30–40 days
    ServiceOEM / ODM, project schedules, mixed-container loading

    Why specify this unit

    ✓
    Full clear opening: The whole sash area opens, giving stronger cross-ventilation than a partial-opening configuration.
    ✓
    Lower hardware cost: A conventional casement gearbox and stay set keeps unit price and after-sales stock simple.
    ✓
    Two opening directions: Specify inward or outward per market convention and façade access rules.
    ✓
    Project schedules: Repeated opening sizes can be grouped into a production schedule with matched sash batches.
    ✓
    Screen integration: Insect screens are engineered for the chosen opening direction rather than added on site.
    ✓
    Export packing: Foam-framed, corner-guarded and container-loaded with full documentation.

    Installation notes

    These are the points that decide whether the unit performs as specified after handover. They are issued as a drawing package with the order and should be read alongside the project’s own structural and waterproofing details.

    1. Check the schedule

    Match each frame to the opening schedule and confirm the opening direction on the drawing — inward and outward variants are not interchangeable on site.

    2. Dry-fit and level

    Set packers at hinge and lock points, check diagonals, and keep the frame square before any anchoring.

    3. Fix without distorting

    Anchor at the specified centres, tightening progressively; over-tightening a single fixing bows the frame and causes sash drop.

    4. Seal and drain

    Install the exterior weather seal and interior air seal, then verify weep holes are unobstructed and discharge to the outside.

    5. Glaze with correct packers

    Use glazing bridge packers so the sash weight is carried at the diagonal corners, not at the hinge alone.

    6. Commission

    Cycle every sash, adjust the stay friction and striker, and record any handle stiffening before handover.

    Where it is specified

    Volume housing

    Repeated opening sizes, low unit cost and simple hardware make it the standard choice for phased residential builds.

    Warm-climate projects

    Full-open ventilation is more valuable than secure night ventilation in markets where windows stay open for long periods.

    Schools and low-rise commercial

    Robust operation, easy replacement parts and optional limiters for child safety.

    Renovation programmes

    Made-to-measure frames absorb out-of-square existing openings without rebuilding the reveal.

    Maintenance and service life

    Clean the frame with mild soapy water, clear the drainage slots seasonally and check stay friction once a year. Because the sash is side-hung, hinge adjustment is the main service task: a small drop over time is corrected at the hinge adjuster rather than by planing the sash. Gaskets and stays are replaceable as standard parts.

    How it compares

    CriterionThis configurationAlternative
    Ventilation controlTwo states — closed or fully openTilt-turn: adds a secure restricted-ventilation position
    Unit costLowest in the uPVC rangeHigher due to the tilt-turn gearbox
    Cleaning above groundDepends on opening directionInward tilt-turn: always from inside
    Best fitVolume housing, warm climates, budget-led tendersHigh-rise, hotels, cold climates

    Frequently asked questions

    Are uPVC casement windows available opening outwards?

    Yes. Both inward and outward side-hung variants are produced; the direction must be fixed on the approved drawing because the hinge, stay and screen details differ.

    Can a child-safety limiter be fitted?

    Yes. Restricted-opening stays and handle-operated limiters are available, and are commonly specified for schools and family housing.

    What glazing and U-values can be achieved?

    24–40 mm double Low-E, triple, laminated and tempered build-ups are supported. The declared Uw is calculated from the selected profile series and glass rather than quoted as a fixed catalogue number.

    What is the minimum order and lead time?

    One 20 ft container, with 30–40 days production after drawing approval. Mixed sizes and other uPVC configurations can share the container.

    Do you supply insect screens?

    Fixed, sliding and pleated screens can be included and are specified against the opening direction so they do not clash with the stay.

    Gallery

    uPVC Casement Window — Side-Hung — GLOBHAUS uPVC Casement Window — Side-Hung — GLOBHAUS uPVC Casement Window — Side-Hung — GLOBHAUS

    Talk to the factory

    Send the opening schedule, glazing build-up and target market. Quotations within 24 hours.

    Request a Quote
  • uPVC Tilt-Turn Window — Dual Operation

    uPVC Tilt-Turn Window — Dual Operation. One sash, two movements: secure night ventilation plus a full inward opening for cleaning.

    uPVC Tilt-Turn Window — Dual Operation — GLOBHAUS
    Tilt ventilation · Full inward swing · German hardware geometry

    uPVC Tilt-Turn Window — Dual Operation

    One sash, two movements: secure night ventilation plus a full inward opening for cleaning.

    Overview

    The GH-UP110 is the dual-operation workhorse of the GLOBHAUS uPVC range. A single handle rotates through three positions: locked, tilted inwards about 10–15 degrees for controlled background ventilation, and fully swung inward for maximum opening and safe cleaning of the outer glass from inside the building.

    The inward swing is the reason this configuration dominates Central and Northern European apartment specifications, and why it suits high-rise projects where outward sashes are prohibited or where external access is expensive. Multi-chamber lead-free PVC-U profiles are reinforced with galvanised steel, and the whole perimeter is carried by a single multi-point locking circuit rather than isolated corner locks.

    It is specified most often for apartments, hotels, schools and hospitals, where a facilities team needs a window that ventilates without a security risk and can be cleaned without scaffolding.

    Technical specification

    Profile system70 / 80 / 88 mm multi-chamber lead-free PVC-U with galvanised steel reinforcement
    OperationTilt (approx. 10–15°) + inward turn, single handle, three positions
    HardwareMulti-point perimeter locking, mushroom cams, adjustable hinge/friction stay, optional tilt limiter
    Glazing24–44 mm IGU: double Low-E, triple, laminated acoustic or tempered safety glass
    SealingDual or triple compression gasket system with corner-welded seals
    Thermal / acoustic targetUw and Rw targets set by glazing and profile series; declared values supplied per project calculation
    FinishWhite, black, grey, bronze, wood-grain film or custom RAL-matched laminate
    CertificationCE / NFRC / AS2047 documentation can be prepared for the destination market; confirm the exact standard and test report required at RFQ stage.
    SizesMade to the structural opening; max sash size confirmed against wind load at RFQ stage
    Warranty / MOQ / Lead time10 years on profile · 1 × 20 ft container · 30–40 days
    ServiceOEM / ODM, project engineering, container-loaded export packing

    Why specify this unit

    ✓
    Two movements, one sash: Tilt for rain-safe night ventilation, turn for full opening and easy cleaning — no second sash to pay for.
    ✓
    Perimeter security: Multi-point mushroom cams engage around the whole frame, not just at the handle side.
    ✓
    Cleanable from inside: Inward swing removes external-access costs on upper floors and satisfies façade-access restrictions.
    ✓
    Hardware serviceability: Standardised hinge and gearbox geometry means spare parts can be stocked by the local distributor.
    ✓
    Acoustic upgrades: Laminated glass and asymmetric pane build-ups are available for road, rail and airport-adjacent sites.
    ✓
    One source factory: Extrusion, fabrication, glazing and packing are handled at the GLOBHAUS base in Foshan.
    ✓
    Made to the opening: Sizes, glazing build-ups, hardware grade and finish are specified per project rather than sold off a size chart.

    Installation notes

    These are the points that decide whether the unit performs as specified after handover. They are issued as a drawing package with the order and should be read alongside the project’s own structural and waterproofing details.

    1. Survey the opening

    Record width, height, diagonal and reveal depth on every opening; uPVC is made to measure and on-site trimming of a welded frame is not a workable correction.

    2. Set the sub-frame and level

    Fix a levelled sub-frame or use packers at all fixing points. A twisted frame is the single most common cause of a tilt-turn sash that will not lock.

    3. Anchor at the specified spacing

    Mechanical fixings through the frame or bracket, typically 400–600 mm apart and within 150 mm of corners; keep fixings clear of drainage channels and the steel reinforcement.

    4. Water and air seal

    Apply exterior vapour-open / interior vapour-tight tapes or a compatible sealant system, and keep the frame drainage path open to daylight.

    5. Glaze and adjust

    Set glazing blocks at the correct diagonal positions, then adjust the hinge, stay and striker plates through the full tilt and turn cycle before silicone cures.

    6. Handover

    Demonstrate handle positions, issue the hardware adjustment sheet and record the project-specific spare-part list for the facilities team.

    Where it is specified

    Multi-storey residential

    Inward operation removes the need for external access and satisfies façade rules that prohibit outward-opening sashes.

    Hotels and student housing

    Tilt position delivers ventilation while the restricted opening keeps the room secure and limits noise ingress.

    Schools and healthcare

    Controlled background ventilation without a wide-open sash, plus easy internal cleaning for facilities staff.

    Cold and temperate climates

    Triple glazing and deeper profile series give the thermal performance needed for heating-dominated projects.

    Maintenance and service life

    Wipe profiles with a mild detergent and soft cloth; avoid solvent cleaners that attack the surface film. Vacuum drainage slots and weep holes twice a year, lubricate the locking cams and hinge points annually with a light hardware grease, and re-check striker adjustment if the handle stiffens. Gaskets are replaceable without dismantling the sash, which is why the tilt-turn platform is economical over a 20–30 year service life.

    How it compares

    CriterionThis configurationAlternative
    Ventilation while lockedTilt position with multi-point engagement still activeCasement: either closed or fully open
    External access for cleaningNot required — sash swings inwardOutward casement: usually required above ground floor
    Hardware complexity / costHigher — one handle drives a full perimeter gearboxLower — simpler hinge and stay set
    Best fitApartments, hotels, high-rise, cold climatesLow-rise housing, mild climates, budget-led programmes

    Frequently asked questions

    What is a uPVC tilt-turn window?

    A single-sash window whose handle selects three positions: locked, tilted inward roughly 10–15 degrees for ventilation, or fully swung inward. It gives secure background ventilation and lets the outer glass be cleaned from inside the room.

    Can tilt-turn windows be used in high-rise apartments?

    Yes — the inward swing is often preferred on upper floors because no sash projects over the façade and cleaning needs no external access. Sash size and hardware grade are confirmed against the project wind load at RFQ stage.

    What glazing can be specified?

    The 24–44 mm glazing rebate accepts double Low-E, triple, laminated acoustic and tempered safety IGUs. Target Uw and Rw values are calculated from the chosen build-up rather than quoted as a fixed number.

    What are the MOQ and lead time?

    Minimum order is one 20 ft container and production lead time is normally 30–40 days after drawing approval. Mixed configurations can be loaded in the same container.

    Can the hardware be serviced locally?

    Yes. The hinge, gearbox and cam geometry follow standard tilt-turn dimensions, and a project-specific spare-part list is supplied at handover so distributors can stock wear items.

    Gallery

    uPVC Tilt-Turn Window — Dual Operation — GLOBHAUS uPVC Tilt-Turn Window — Dual Operation — GLOBHAUS uPVC Tilt-Turn Window — Dual Operation — GLOBHAUS

    Talk to the factory

    Send the opening schedule, glazing build-up and target market. Quotations within 24 hours.

    Request a Quote
  • Tilt-Turn Hardware Standards Importers Must Verify

    Tilt-Turn Hardware Standards Importers Must Verify

    Tilt-Turn Hardware Standards Importers Must Verify

    GLOBHAUS Hardware Engineering · 6 min read · 2026-09-28

    Tilt-Turn Hardware Standards Importers Must Verify

    A tilt-turn window lives or dies by its hardware. The glass and frame can be perfect, but a weak hinge or gearbox turns the whole unit into a service call. Here is what to verify.

    European standard: EN 13126

    Hardware for tilt-turn windows is governed by EN 13126, which grades hinges and operators by size category and durability class (tested cycles). For residential export, demand at least Class 3 (20,000 cycles) on the main operator.

    Locking points

    More locking points = better security and tighter seal. A quality tilt-turn should engage at minimum 4–6 mushroom/cam locks around the frame, not just the two at the handle.

    Corrosion resistance

    Coastal and humid markets need hardware tested to EN 1670 Class 4 (480h salt spray) or better. Specify stainless or coated steel; bright zinc alone will fail near the sea.

    Hinge load rating

    Heavy triple-glazed sashes can exceed 50 kg. Confirm the hinge size category matches the sash weight with margin — undersized hinges sag and bind within a season.

    A 2-dollar saving on a gearbox is the most expensive corner an importer can cut. Specify the grade, not the price.

    What to put in the PO

    • Hardware brand and EN 13126 class.
    • Number of locking points per sash.
    • Corrosion class for the destination climate.
    • Spare parts kit quantity per container.

    GLOBHAUS documents all of the above per order and ships matched spare handles, gears and hinges so your after-sales stays cheap.

    Specification checklist for tilt-turn hardware

    A tilt-turn operator depends on four coordinated parts: the hinge set, the multi-point locking gear, the handle and the gearing housed in the outer frame profile. For openings wider than 900 mm or taller than 1300 mm, specify reinforced hinges rated for the sash weight rather than the standard pair, and confirm the gearbox throw matches the lock keep positions. Corrosion class should follow the project environment — coastal or industrial sites need at least class 4 (or the relevant local grade), while interior or dry climates can use the standard class. Stainless or coated strikers and a handle with a key-lock function are worth specifying for ground-floor and accessible openings. Exact load ratings, corrosion grades and hardware brands are confirmed per project against the sash size and the destination market's compliance list.

    Common specification mistakes

    The most frequent error is sizing the hinge for the frame width instead of the sash weight, which leads to sag and poor sealing after one season. A second mistake is mixing hardware families — pairing a competitor's gearbox with a different brand's keep rarely aligns, and the result is a handle that binds. Specifying a tilt-first restrictor only, without a child-safe turn limiter, is another gap on family or school projects. Finally, buyers sometimes omit the striker finish, so the same hardware shows two colours at the meeting rail. List the full hardware kit (hinges, gear, handles, keeps, restrictors) as one line item so the factory quotes and builds a matched set.

    Procurement and incoming QC

    On receipt, check that the hinge stamps match the quoted corrosion class and that the gearbox carries the expected brand marking — substitutions are common and quietly lower the service life. Operate each sample sash through the full tilt-turn-swing cycle ten times and confirm the handle engages all locking points without excessive force. Verify the keep screw centres against the frame drillings before mass assembly, because a 2 mm offset means field re-drilling. Keep one assembled corner as a golden sample for the line. Any hardware certificate, test report or brand conformity document is supplied per project on request and confirmed against the order specification.

    Quick takeaways for specifiers

    For the specifier the practical rule is simple: size every moving part to the sash it actually carries, not to a catalogue default, and write the whole hardware kit — hinges, gearbox, handles, keeps and restrictors — as a single matched line so the factory cannot quietly substitute one component. Confirm the corrosion class against where the building sits: a coastal or industrial site earns the higher grade even when the standard unit would pass on paper. Keep one assembled corner as a reference sample and re-check it against the approved drawing at goods-in. Any certification, test report or brand conformity document is supplied per project and confirmed against the order specification before the container is booked, so what is quoted is what is built. Where the sash is heavy or the opening is large, ask the supplier to state the tested cycle count so wear over the building's life is understood rather than assumed, and specify the replacement lead time for the gearbox.

    GLOBHAUS · VIDEO

    Factory & Product Videos

    A new video from our Foshan factory, updated daily.

    #doorsandwindowsfactory #windowmanufacturer #customwindows #aluminumwindows #windowsanddoors · 2026-11-17

    See all videos on our YouTube channel →

  • A Buyer’s QC Checklist for Importing Windows from China

    A Buyer’s QC Checklist for Importing Windows from China

    A Buyer’s QC Checklist for Importing Windows from China

    GLOBHAUS Export Desk · 9 min read · 2026-10-05

    A Buyer's QC Checklist for Importing Windows from China

    China is the world’s window factory, but “made in China” spans a vast quality range. After shipping thousands of containers, here is the QC checklist we wish every new importer used before the first order.

    1. Audit the factory, not just the sample

    A showroom sample can come from anyone. Verify the actual production base: in-house extrusion, CNC fabrication, and a real batch-testing lab. Ask for a video walkthrough of the line.

    2. Demand the test reports

    Require EN 12207 (air), EN 12208 (water), EN 12211 (wind) and, for energy claims, the Uw calculation and PHI/NFRC certificates. Reports should name your exact configuration, not a generic sibling product.

    3. Lock the bill of materials

    Write the profile system, glass build-up, hardware brand and gaskets into the contract. Substitutions are the #1 cause of “this isn’t what I ordered” disputes.

    4. Packing and loading

    • Each unit foam-wrapped, corner-protected, on labelled pallets.
    • Desiccant inside the container; bracing so pallets cannot shift.
    • Request loading photos and a packing list cross-checked to the invoice.

    5. Pre-shipment inspection

    Budget a third-party QC inspection (SGS, TÜV or similar) at 80–100% of a random sample before container seal. Check dimensions to drawing, operation of every hardware piece, glazing seals, and label accuracy.

    The cheapest container is the one you inspect before it sails, not after it arrives with a claim.

    Common pitfalls

    • Chasing the lowest price and getting down-specced hardware.
    • Forgetting sea moisture — without desiccant, glazing edge failure follows.
    • No documented Incoterms; dispute over who owns the goods at which port.

    GLOBHAUS ships FOB/CIF/CFR with full documentation and batch traceability, and we welcome independent pre-shipment inspection on every order.

    Pre-shipment QC checklist

    Before containers are booked, lock a written QC plan with the factory: profile brand and batch, glass make and certification, hardware kit, dimensional tolerances and packing method. Require the supplier to submit a pre-production sample that is measured, operated and photographed, then sealed as the reference unit. For the main run, a third-party inspector should attend during the last 20% of production to pull a statistical sample rather than only inspecting finished goods. The inspection should cover profile wall and chamber integrity, glazing bead fit, drainage holes, gasket continuity and the function of every handle and lock. Which certificates and test reports are needed is set per destination market and confirmed at RFQ stage so they are quoted with the order.

    What to measure and verify

    Confirm the frame and sash dimensions against the approved shop drawings within the agreed tolerance (commonly ±1.5 mm for the frame, ±2 mm for the sash). Check the glazing thickness matches the specified unit, and that the spacer and gas fill are as quoted. Verify the profile stamp or laser mark identifies the correct system and that recycled or substituted extrusions are not present. Open and close each sampled sash to confirm smooth travel and full multi-point engagement. Photograph the glazing edge, the corner weld and the drainage path. Any performance figure such as U-value or acoustic rating is taken from the project's confirmed specification and the relevant test report.

    Packing and documentation

    Poor packing causes more import rejects than the product itself. Require individual corners protected, sashes separated by rigid spacers, and the whole unit wrapped against humidity during ocean transit. The carton or crate label should carry the project code, opening size, hand (left/right) and glass build-up so the site can sort without opening every carton. Commercial documents — packing list, invoice, bill of lading and the certificates — must match the HS code and declared values exactly to avoid customs holds. Ask the supplier to pre-send the document pack for review; discrepancies are far cheaper to fix before the container leaves than after it arrives.

    Quick takeaways for specifiers

    The import QC plan earns its keep long before the container arrives. Lock a written checklist with the factory during order confirmation — profile brand and batch, glass make and certification, hardware kit, dimensional tolerances and packing method — and require a sealed pre-production sample as the reference unit. Inspect during the last twenty percent of production on a statistical sample rather than only finished goods, because that is when substitutions and tolerance drift actually show up. Match every commercial document to the HS code and declared values exactly, and pre-send the document pack for review. Discrepancies are far cheaper to fix at the factory than after the shipment clears customs at the port.