
uPVC Bay & Bow Window — Projected Glazing
A projected glazing composition that adds floor area, daylight and a façade feature from standard uPVC parts.
Overview
Bay and bow windows project beyond the wall line, turning a flat opening into a three-dimensional glazed composition. A bay normally uses three panels with two angled side lights; a bow uses four or more shallow-angle panels for a curved appearance. Both are assembled from standard GLOBHAUS uPVC sashes joined with purpose-made angle or radius mullions.
The GH-UP150 package covers the glazed units plus the junction details: corner posts, head and sill boards, reinforcement where the projection is cantilevered, and the flashing interface to the wall. Because the projection changes how water and load are handled, the structural and waterproofing details are reviewed at drawing approval rather than left to the installer.
Typical use is living-room feature glazing in residential projects, hotel lounges and street-facing retail façades where daylight and a wider view are part of the design intent.
Technical specification
| Profile system | 70 / 80 mm lead-free PVC-U sashes with reinforced corner / angle mullions |
|---|---|
| Configurations | 3-panel bay (30° / 45° side lights) or 4–5 panel bow (shallow angles) |
| Operation | Fixed centre light with operable side casements or tilt-turn units, per project |
| Glazing | Double or triple Low-E, laminated or tempered safety IGU; matching build-up across all panels |
| Structure | Projection support, head and sill boards, cantilever reinforcement checked per opening |
| Waterproofing | Head flashing, sill drainage and corner-post seals detailed at drawing approval |
| Finish | White, black, grey, bronze, wood-grain film, custom laminate |
| Certification | CE / NFRC / AS2047 documentation can be prepared for the destination market; confirm the exact standard and test report required at RFQ stage. |
| Warranty / MOQ / Lead time | 10 years on profile · 1 × 20 ft container · 35–45 days |
| Service | OEM / ODM, project engineering, panel-by-panel packing schedule |
Why specify this unit
Installation notes
These are the points that decide whether the unit performs as specified after handover. They are issued as a drawing package with the order and should be read alongside the project’s own structural and waterproofing details.
1. Verify the support
Confirm the projection is carried by a bracket, corbel or structural sill before the frame is released.
2. Dry-assemble the posts
Set out the angle mullions on a level base and check all panel angles against the approved elevation.
3. Anchor progressively
Fix the base and head boards at specified centres, tightening in sequence to keep the projection square.
4. Flash the head
Install head flashing that drains to the outside and ties into the wall’s weather line; this is the critical water detail.
5. Seal every corner post
Apply compatible sealant at post joints and water-test the full composition before interior finishes.
6. Fit and commission sashes
Glaze panels in elevation order, then adjust operable side lights and record the panel numbering at handover.
Where it is specified
Residential living rooms
Feature glazing with a window seat and wider outlook.
Hotel lounges and restaurants
Daylight from three directions and a distinctive street-facing elevation.
Retail frontages
Display depth behind the glass without extending the building footprint.
Renovation of period façades
Made-to-measure projections that match existing bay geometry.
Maintenance and service life
The head flashing and corner-post seals are the service-critical items: inspect them annually and after severe storms. Clear the sill drainage path twice a year, check that the projection brackets remain sound, and re-adjust operable side sashes as for a standard casement. Keep the panel numbering drawing for future glass replacement.
How it compares
| Criterion | This configuration | Alternative |
|---|---|---|
| Façade effect | Projects beyond the wall, three-direction daylight | Flat window: single-plane elevation |
| Waterproofing complexity | Higher — head flashing and post joints | Standard perimeter seal |
| Cost | Higher due to junction posts and support | Baseline |
| Best fit | Feature glazing, living rooms, hospitality frontages | Repeated standard openings |
Frequently asked questions
What is the difference between a bay and a bow window?
A bay usually has three panels with two angled side lights; a bow uses four or more shallow-angle panels for a curved appearance. Both are built from standard GLOBHAUS uPVC sashes with project-specific angle posts.
Does a bay window need structural support?
Yes. The projection must be carried by brackets, corbels or a structural sill. GLOBHAUS reviews the support and issues head/sill/corner details at drawing approval.
Can the side panels open?
Yes. The centre light is normally fixed and the side lights can be casement or tilt-turn units; the mix is set on the approved elevation.
How is the head made watertight?
With a head flashing that ties into the wall weather line and drains outward, plus sealed corner posts and a drained sill. These details are supplied as drawings rather than left to site practice.
What are MOQ and lead time?
One 20 ft container with 35–45 days production after drawing approval, reflecting the project-specific junction parts.
Gallery

Talk to the factory
Send the opening schedule, glazing build-up and target market. Quotations within 24 hours.
Request a Quote