uPVC Sliding Window — Two & Three Track

uPVC Sliding Window — Two & Three Track. Horizontal panels that free the space in front of the window — the practical choice for balconies and tight rooms.

uPVC Sliding Window — Two & Three Track — GLOBHAUS
Horizontal travel · No swing clearance · Two or three track

uPVC Sliding Window — Two & Three Track

Horizontal panels that free the space in front of the window — the practical choice for balconies and tight rooms.

Overview

The GH-UP130 uses horizontally travelling panels on two or three tracks, so no sash projects into the room or over the façade. That single geometric difference is why sliding units are specified for balconies, kitchens, narrow corridors and any room where furniture or a walkway sits directly in front of the glazing.

Two-track configurations give one moving panel per fixed panel; three-track builds add a second moving leaf and allow insect or shade screens to run on their own track. Reinforced lead-free PVC-U profiles carry tandem rollers, and a brush-plus-gasket perimeter manages the air and water seal that a compression-sealed casement gets from its gasket alone.

For North American programmes this platform is quoted as vinyl sliding windows; for Europe, the Middle East and Africa it is specified as uPVC sliding windows. Both wordings map to the same GLOBHAUS GH-UP130 production line.

Technical specification

Profile system62 / 70 / 80 / 88 mm lead-free PVC-U, steel-reinforced sash and frame
TracksTwo-track (1 fixed + 1 moving) or three-track (2 moving / screen track)
HardwareTandem adjustable rollers, stainless or coated track, two-point hook lock, optional anti-lift block
GlazingDouble Low-E, laminated acoustic or tempered safety IGU; 20–32 mm typical
Panel sizeMade to opening; maximum width/weight confirmed against roller rating at RFQ stage
SealingInterlocking meeting stile with brush seals, drained sill track, sill weep outlets
FinishWhite, black, grey, bronze, wood-grain film, custom laminate
CertificationCE / NFRC / AS2047 documentation can be prepared for the destination market; confirm the exact standard and test report required at RFQ stage.
Warranty / MOQ / Lead time10 years on profile · 1 × 20 ft container · 30–40 days
ServiceOEM / ODM, project schedules, screen and track accessories

Why specify this unit

✓
Zero swing clearance: Panels stay inside the frame footprint, so furniture, blinds and balcony space are unaffected.
✓
Up to two thirds clear opening: Three-track builds let two leaves stack for a wider unobstructed aperture than a single slider.
✓
Adjustable rollers: Roller height can be corrected on site after the building settles, without replacing the sash.
✓
Integrated screen track: Three-track variants accept insect or solar screens without surface-mounted add-ons.
✓
Anti-lift security: Anti-lift blocks and hook locks address the usual specification objection to sliding units.
✓
Regional vocabulary: Supplied and documented as vinyl sliding windows for North America and uPVC sliding windows elsewhere.

Installation notes

These are the points that decide whether the unit performs as specified after handover. They are issued as a drawing package with the order and should be read alongside the project’s own structural and waterproofing details.

1. Protect and level the sill

The sill track must be dead level across its full length; a 2–3 mm fall causes panels to self-drive and defeats the lock alignment.

2. Dry-fit the outer frame

Confirm the track is square and the drainage outlets point outward before fixing.

3. Anchor through the track zone

Fix at the specified centres without piercing the drainage channel or the roller running surface.

4. Seal the perimeter

Apply exterior weather and interior air seals, then water-test the sill and confirm weep outlets discharge freely.

5. Lift in the panels

Insert fixed panels first, then moving leaves; set roller height with the adjustment screw until the meeting stiles are parallel.

6. Set locks and anti-lift

Align hook keeps with the striker and fit anti-lift blocks, then cycle every panel under load before handover.

Where it is specified

Apartment balconies

No inward or outward swing means balcony furniture and doors stay usable.

Kitchens and utility rooms

Ventilation above worktops without clashing with taps, blinds or cabinets.

Narrow corridors and small rooms

Panels travel within the wall thickness, preserving circulation space.

North American vinyl replacement programmes

Same platform documented as vinyl sliding windows with region-appropriate terminology and glazing.

Maintenance and service life

Keep the sill track free of grit — vacuum the channel quarterly and wash the roller path with a mild detergent. Brush seals at the meeting stile are replaceable wear items; check them annually and adjust roller height if a panel begins to drag. Lubricate the hook lock but avoid oil on the track itself, which attracts dust.

How it compares

CriterionThis configurationAlternative
Swing clearanceNone — panels stay in the frame planeCasement / tilt-turn: needs clear space
Maximum open areaRoughly 50–66% of the apertureCasement: close to 100%
Air tightnessBrush-sealed interlock, good but below compression gasketsTilt-turn: compression seal on full perimeter
Best fitBalconies, kitchens, tight rooms, vinyl replacementHigh-rise, cold climates, maximum insulation

Frequently asked questions

What is the difference between uPVC and vinyl sliding windows?

The two terms describe the same material — unplasticised polyvinyl chloride. North American specifications normally say vinyl; European, Middle Eastern and African tenders say uPVC. GLOBHAUS supplies the GH-UP130 platform under either wording.

How much of the window actually opens?

A two-track unit opens about half the aperture; a three-track build with two moving leaves can approach two thirds, with an optional independent screen track.

Are sliding windows secure enough for ground-floor use?

Two-point hook locks, anti-lift blocks and a reinforced meeting stile are standard options; the project security class should be stated at RFQ stage so the correct hardware is quoted.

What sizes are possible?

Panels are made to the opening, but maximum width and weight are set by the roller rating and wind load. Send the opening schedule and we confirm the limits before quotation.

What are MOQ and lead time?

One 20 ft container with 30–40 days production after drawing approval; mixed uPVC configurations can be combined in one container.

Gallery

uPVC Sliding Window — Two & Three Track — GLOBHAUS uPVC Sliding Window — Two & Three Track — GLOBHAUS uPVC Sliding Window — Two & Three Track — GLOBHAUS

Talk to the factory

Send the opening schedule, glazing build-up and target market. Quotations within 24 hours.

Request a Quote