Tilt-Turn Casement Window

Tilt-Turn Casement Window - window system product view

Tilt-Turn Casement Window. Tilt for ventilation, turn for cleaning — one handle, two functions.

Tilt-Turn Casement Window — GLOBHAUS
Two-mode opening · Thermally broken · Multi-point locking

Tilt-Turn Casement Window

Tilt for ventilation, turn for cleaning — one handle, two functions.

Overview

Tilt for ventilation, turn for cleaning — one handle, two functions. The GH-AL100 is built on the GLOBHAUS integrated production base and specified for Residential, apartments. Secure tilt ventilation or full turn for cleaning access. Insulated profile for real U-value performance.

Technical specification

ProfileThermally-broken aluminium system
OpeningTilt and turn, multi-point hardware
GlazingDouble IGU, optional Low-E
FinishPowder-coat, anodised or wood-grain
CertificationCE · NFRC (project dependent)
Warranty10 years on profile
MOQ1 × 20 ft container
Lead time30–40 days
ServiceOEM / ODM custom, project engineering

Why specify this unit

✓
Two-mode opening: Secure tilt ventilation or full turn for cleaning access.
✓
Thermally broken: Insulated profile for real U-value performance.
✓
Multi-point locking: Security and sealing around the whole sash.
✓
System matched: Integrates with the door and façade range.
✓
One source factory: Built, tested and packed at the GLOBHAUS integrated base in Foshan — no trading margin.
✓
Made to the opening: Sizes, finishes, glazing and operation specified per project, not sold off a size chart.
✓
Export ready: Foam-framed, corner-guarded and container-loaded with full documentation.
✓
OEM / ODM: Private label, custom profiles and project documentation supported.

Gallery

Tilt-Turn Casement Window — GLOBHAUS Tilt-Turn Casement Window — GLOBHAUS Tilt-Turn Casement Window — GLOBHAUS

Talk to the factory

MOQ, lead time, glazing and hardware — quotations within 24 hours.

Request a Quote

Frequently asked questions

What is the minimum order quantity for Tilt-Turn Casement Window?

The MOQ is 1 × 20 ft container. Mixed configurations and sizes can be loaded in the same container, so a project schedule does not need to reach container volume for a single SKU.

How long does production take?

Standard lead time is 30–40 days after drawing and glass build-up approval. Packing, documentation and container loading are included in that window.

Which glazing options can be specified?

The specification for this unit is: Double IGU, optional Low-E. The final build-up is confirmed against the project’s thermal, acoustic and safety requirements.

Can dimensions, finishes and hardware be customised?

Yes — OEM / ODM custom, project engineering. The platform is multi-chamber lead-free PVC-U or aluminium profile systems, and sizes, colour, glass and hardware grade are set per project rather than sold from a fixed size chart.

Which certification documents are supplied?

CE · NFRC (project dependent). State the destination market and the required test reports at RFQ stage so the correct documentation is quoted with the order.