
German System Door
Multi-point locking and automotive-grade sealing on an alloy-resin system door.
Overview
Multi-point locking and automotive-grade sealing on an alloy-resin system door. The GH-GS200 is built on the GLOBHAUS integrated production base and specified for Residential entrances. Security engaged along the full sash height. Gasket system borrowed from vehicle door practice.
Technical specification
| Profile | Alloy-resin system profile |
|---|---|
| Hardware | Multi-point lock, heavy-duty hinges |
| Sealing | Automotive-grade gasket system |
| Threshold | Low or standard, weather rated |
| Certification | CE · NFRC (PHI on project) |
| Warranty | 10 years on profile |
| MOQ | 1 × 20 ft container |
| Lead time | 30–40 days |
| Service | OEM / ODM custom, project engineering |
Why specify this unit
Gallery

Talk to the factory
MOQ, lead time, glazing and hardware — quotations within 24 hours.
Request a QuoteFrequently asked questions
What is the minimum order quantity for German System Door?
The MOQ is 1 × 20 ft container. Mixed configurations and sizes can be loaded in the same container, so a project schedule does not need to reach container volume for a single SKU.
How long does production take?
Standard lead time is 30–40 days after drawing and glass build-up approval. Packing, documentation and container loading are included in that window.
Which glazing options can be specified?
The specification for this unit is: double or triple insulated, Low-E, laminated or tempered glass. The final build-up is confirmed against the project’s thermal, acoustic and safety requirements.
Can dimensions, finishes and hardware be customised?
Yes — OEM / ODM custom, project engineering. The platform is multi-chamber lead-free PVC-U or aluminium profile systems, and sizes, colour, glass and hardware grade are set per project rather than sold from a fixed size chart.
Which certification documents are supplied?
CE · NFRC (PHI on project). State the destination market and the required test reports at RFQ stage so the correct documentation is quoted with the order.