German System Door

German System Door - window system product view

German System Door. Multi-point locking and automotive-grade sealing on an alloy-resin system door.

German System Door — GLOBHAUS
Multi-point locking · Automotive sealing · System matched

German System Door

Multi-point locking and automotive-grade sealing on an alloy-resin system door.

Overview

Multi-point locking and automotive-grade sealing on an alloy-resin system door. The GH-GS200 is built on the GLOBHAUS integrated production base and specified for Residential entrances. Security engaged along the full sash height. Gasket system borrowed from vehicle door practice.

Technical specification

ProfileAlloy-resin system profile
HardwareMulti-point lock, heavy-duty hinges
SealingAutomotive-grade gasket system
ThresholdLow or standard, weather rated
CertificationCE · NFRC (PHI on project)
Warranty10 years on profile
MOQ1 × 20 ft container
Lead time30–40 days
ServiceOEM / ODM custom, project engineering

Why specify this unit

✓
Multi-point locking: Security engaged along the full sash height.
✓
Automotive sealing: Gasket system borrowed from vehicle door practice.
✓
System matched: Matches the window range profile-for-profile.
✓
Entrance duty: Built for the opening that is used every day.
✓
One source factory: Built, tested and packed at the GLOBHAUS integrated base in Foshan — no trading margin.
✓
Made to the opening: Sizes, finishes, glazing and operation specified per project, not sold off a size chart.
✓
Export ready: Foam-framed, corner-guarded and container-loaded with full documentation.
✓
OEM / ODM: Private label, custom profiles and project documentation supported.

Gallery

German System Door — GLOBHAUS German System Door — GLOBHAUS German System Door — GLOBHAUS

Talk to the factory

MOQ, lead time, glazing and hardware — quotations within 24 hours.

Request a Quote

Frequently asked questions

What is the minimum order quantity for German System Door?

The MOQ is 1 × 20 ft container. Mixed configurations and sizes can be loaded in the same container, so a project schedule does not need to reach container volume for a single SKU.

How long does production take?

Standard lead time is 30–40 days after drawing and glass build-up approval. Packing, documentation and container loading are included in that window.

Which glazing options can be specified?

The specification for this unit is: double or triple insulated, Low-E, laminated or tempered glass. The final build-up is confirmed against the project’s thermal, acoustic and safety requirements.

Can dimensions, finishes and hardware be customised?

Yes — OEM / ODM custom, project engineering. The platform is multi-chamber lead-free PVC-U or aluminium profile systems, and sizes, colour, glass and hardware grade are set per project rather than sold from a fixed size chart.

Which certification documents are supplied?

CE · NFRC (PHI on project). State the destination market and the required test reports at RFQ stage so the correct documentation is quoted with the order.