Solar-Roof Sunroom

Solar-Roof Sunroom - window system product view

Solar-Roof Sunroom. Roof glazing integrated with photovoltaic panels.

Solar-Roof Sunroom — GLOBHAUS
Generates power · Energy offset · Engineered integration

Solar-Roof Sunroom

Roof glazing integrated with photovoltaic panels.

Overview

Roof glazing integrated with photovoltaic panels. The GH-SR260 is built on the GLOBHAUS integrated production base and specified for Energy-efficiency projects, solar programmes. PV panels built into the roof build-up. Cuts running load of the glazed space.

Technical specification

RoofIntegrated photovoltaic panels
StructureAluminium frame
OutputOn-site generation
GlazingInsulated glass units
CertificationCE · wind load calculation supplied
Warranty10 years on frame
MOQ1 × 20 ft container
Lead time30–45 days
ServiceOEM / ODM custom, project engineering

Why specify this unit

✓
Generates power: PV panels built into the roof build-up.
✓
Energy offset: Cuts running load of the glazed space.
✓
Engineered integration: Structure designed for panel load.
✓
Sustainability target: Specified where the project has an energy goal.
✓
One source factory: Built, tested and packed at the GLOBHAUS integrated base in Foshan — no trading margin.
✓
Made to the opening: Sizes, finishes, glazing and operation specified per project, not sold off a size chart.
✓
Export ready: Foam-framed, corner-guarded and container-loaded with full documentation.
✓
OEM / ODM: Private label, custom profiles and project documentation supported.

Gallery

Solar-Roof Sunroom — GLOBHAUS Solar-Roof Sunroom — GLOBHAUS Solar-Roof Sunroom — GLOBHAUS

Talk to the factory

MOQ, lead time, glazing and hardware — quotations within 24 hours.

Request a Quote

Frequently asked questions

What is the minimum order quantity for Solar-Roof Sunroom?

The MOQ is 1 × 20 ft container. Mixed configurations and sizes can be loaded in the same container, so a project schedule does not need to reach container volume for a single SKU.

How long does production take?

Standard lead time is 30–45 days after drawing and glass build-up approval. Packing, documentation and container loading are included in that window.

Which glazing options can be specified?

The specification for this unit is: Insulated glass units. The final build-up is confirmed against the project’s thermal, acoustic and safety requirements.

Can dimensions, finishes and hardware be customised?

Yes — OEM / ODM custom, project engineering. The platform is multi-chamber lead-free PVC-U or aluminium profile systems, and sizes, colour, glass and hardware grade are set per project rather than sold from a fixed size chart.

Which certification documents are supplied?

CE · wind load calculation supplied. State the destination market and the required test reports at RFQ stage so the correct documentation is quoted with the order.