GLOBHAUS Export Desk · 9 min read · 2026-10-05
China is the world’s window factory, but “made in China” spans a vast quality range. After shipping thousands of containers, here is the QC checklist we wish every new importer used before the first order.
1. Audit the factory, not just the sample
A showroom sample can come from anyone. Verify the actual production base: in-house extrusion, CNC fabrication, and a real batch-testing lab. Ask for a video walkthrough of the line.
2. Demand the test reports
Require EN 12207 (air), EN 12208 (water), EN 12211 (wind) and, for energy claims, the Uw calculation and PHI/NFRC certificates. Reports should name your exact configuration, not a generic sibling product.
3. Lock the bill of materials
Write the profile system, glass build-up, hardware brand and gaskets into the contract. Substitutions are the #1 cause of “this isn’t what I ordered” disputes.
4. Packing and loading
- Each unit foam-wrapped, corner-protected, on labelled pallets.
- Desiccant inside the container; bracing so pallets cannot shift.
- Request loading photos and a packing list cross-checked to the invoice.
5. Pre-shipment inspection
Budget a third-party QC inspection (SGS, TÜV or similar) at 80–100% of a random sample before container seal. Check dimensions to drawing, operation of every hardware piece, glazing seals, and label accuracy.
The cheapest container is the one you inspect before it sails, not after it arrives with a claim.
Common pitfalls
- Chasing the lowest price and getting down-specced hardware.
- Forgetting sea moisture — without desiccant, glazing edge failure follows.
- No documented Incoterms; dispute over who owns the goods at which port.
GLOBHAUS ships FOB/CIF/CFR with full documentation and batch traceability, and we welcome independent pre-shipment inspection on every order.
Request a Quote More insights
Pre-shipment QC checklist
Before containers are booked, lock a written QC plan with the factory: profile brand and batch, glass make and certification, hardware kit, dimensional tolerances and packing method. Require the supplier to submit a pre-production sample that is measured, operated and photographed, then sealed as the reference unit. For the main run, a third-party inspector should attend during the last 20% of production to pull a statistical sample rather than only inspecting finished goods. The inspection should cover profile wall and chamber integrity, glazing bead fit, drainage holes, gasket continuity and the function of every handle and lock. Which certificates and test reports are needed is set per destination market and confirmed at RFQ stage so they are quoted with the order.
What to measure and verify
Confirm the frame and sash dimensions against the approved shop drawings within the agreed tolerance (commonly ±1.5 mm for the frame, ±2 mm for the sash). Check the glazing thickness matches the specified unit, and that the spacer and gas fill are as quoted. Verify the profile stamp or laser mark identifies the correct system and that recycled or substituted extrusions are not present. Open and close each sampled sash to confirm smooth travel and full multi-point engagement. Photograph the glazing edge, the corner weld and the drainage path. Any performance figure such as U-value or acoustic rating is taken from the project's confirmed specification and the relevant test report.
Packing and documentation
Poor packing causes more import rejects than the product itself. Require individual corners protected, sashes separated by rigid spacers, and the whole unit wrapped against humidity during ocean transit. The carton or crate label should carry the project code, opening size, hand (left/right) and glass build-up so the site can sort without opening every carton. Commercial documents — packing list, invoice, bill of lading and the certificates — must match the HS code and declared values exactly to avoid customs holds. Ask the supplier to pre-send the document pack for review; discrepancies are far cheaper to fix before the container leaves than after it arrives.
Quick takeaways for specifiers
The import QC plan earns its keep long before the container arrives. Lock a written checklist with the factory during order confirmation — profile brand and batch, glass make and certification, hardware kit, dimensional tolerances and packing method — and require a sealed pre-production sample as the reference unit. Inspect during the last twenty percent of production on a statistical sample rather than only finished goods, because that is when substitutions and tolerance drift actually show up. Match every commercial document to the HS code and declared values exactly, and pre-send the document pack for review. Discrepancies are far cheaper to fix at the factory than after the shipment clears customs at the port.